Specification

STRACTURE

R.C.C. frame structure

WALL FINISH

Internal mala plaster with lapi finish and external double coat sand face plaster with cement paints.

FLOORING

Vitrified tiles flooring in Drawing, Dining, Kitchen & Ceramic tiles flooring will provided in bed rooms & balcony.

DOORS

Wooden frame in all doors, decorative main door, all other doors will provided with flush door.

WINDOWS

Fully glazed powder coated aluminium windows with stone revil and safety grills.

KITCHEN

Granite (Sandwich type) platform along with stainless steel sink.

TOILETS

Coloured glazed tiles dado up lintel level, Good quality ware with C.P. fittings

ELECTRIFICATION

Single phase copper wiring with necessary points as per design of the Architects.

NOTES

Stamp duty, registration charges, legal documentation charges,service tax, G.U.D.A. charges, drainage/water connection charges, maintenance deposit & G.E.B. (Electrification) charges, shall be borne by the member separately.

Any additional charges or duties levied by the government/local authorities during or after the completion of the scheme will be borne by the member.

Internal changes & extra works shall be done with prior permission and shall be charged extra in advance.hanges in external elevation shall not be permitted.

Membership of the member will be Cancelled automatically, who will be unable to make payment in time & deposited amount will be refunded after new booking with 10% deduction of unit cost as administration charge.

The project consultants (developers) reserve all the rights to make any changes to the designs and/or specifications of the scheme without prior notice and same shall be binding to all members.

This brochure is not to be treated as a part of a legal document & consumer contract. It is meant for easy display & general information.